Gallagher-Kaiser Corporation utilizes a seven-step process to ensure that all our solutions perform as expected and are delivered on time. The quality control checks occurring at each step guarantee that each completed project is of the highest quality, environmentally compatible and cost effective. The G-K Engineering and Design department performs critical pre and post installation and manufacturing activities. Staffed by civil, mechanical, and structural engineers; the department delivers innovative support for every project.
Pre-PlanningThe client’s expectations are defined and studied to determine the requirements of the proposed construction project. Utilizing in-house conceptual engineering expertise, Gallagher-Kaiser Corporation creates drawings. Where applicable, more cost-effective, alternate solutions are offered to the customer.
Design and Engineering Drawings of each component are created. Multiple cross sections and isometric views are generated to eliminate ambiguity and aid the manufacturing and installation departments in adhering to “fast track” scheduling.
Start-Up and ValidationTesting is conducted during start up to ensure optimal system and building operation. Discrepancies between system performance and design parameters are identified and eliminated.
TrainingOperators and maintenance personnel are provided with hands on training developed by G-K engineers.
ServicePrompt, efficient service is available for all systems and buildings provided by G-K.