Las Vegas, McCarran International Airport, T-3 Terminal Project:
General Contractor: Perini Building Company, Inc.
Program Manager: Bechtel
Duration: October, 2008 through January, 2012
Scope of Work: G-K was contracted to provide all HVAC Ductwork for the Terminal Building that is a ½ Mile long and three stories tall. Our Engineers worked closely with all trades during 3-D Coordination of all aspects of the Structural, Building, and MEP Trades. G-K is responsible for the coordination, scheduling, installation, testing, balancing, and start-up of all major HVAC equipment.