McCarran Airport

Las Vegas, McCarran International Airport, T-3 Terminal Project:

General Contractor:  Perini Building Company, Inc.
Program Manager:    Bechtel
Duration: October, 2008 through January, 2012

Scope of Work:  G-K was contracted to provide all HVAC Ductwork for the Terminal Building that is a ½ Mile long and three stories tall.  Our Engineers worked closely with all trades during 3-D Coordination of all aspects of the Structural, Building, and MEP Trades.  G-K is responsible for the coordination, scheduling, installation, testing, balancing, and start-up of all major HVAC equipment.